Clause 7.2
Replace or repair rejected Plant within 30 days
The Contractor must replace or repair rejected Plant within 30 days of being told of the rejection.
- Party who must act
- Contractor
- Other party
- Engineer
- Category
- Defects
- Trigger type
- Event
- Period
- 30 calendar days, after the trigger
- Time bar
- No
- Trigger event
- Contractor is told of the rejection of Plant
Keys: C confirm, E edit, R reject
Clause 7.2
Rejected Plant
The Contractor shall replace or repair rejected Plant within 30 days of being told of the rejection.